United States βΊ Grid βΊ Interconnection queues βΊ Montana
OCTARY USA Β· INTERCONNECTION QUEUESInterconnection queue in Montana (2018 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Onshore wind project 356, Rosebud County Onshore wind |
750 MW | In study |
| Onshore wind project 357, Rosebud County Onshore wind |
750 MW | In study |
| Wind + storage project 347, Wheatland County Wind + storage |
140 MW | Paused / redesign |
| Onshore wind project GEN-2018-069, Wibaux County Onshore wind |
125 MW | Agreement signed |
| Solar + storage project 358, Yellowstone County Solar + storage |
80.0 MW | Paused / redesign |
| Solar + storage project 340, Yellowstone County Solar + storage |
20.0 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)