United States β€Ί Grid β€Ί Interconnection queues β€Ί Montana

OCTARY USA Β· INTERCONNECTION QUEUES

Gas interconnection queue in Montana

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown5523 MW
Active in queue523 MW5 requests
Agreement signed0.0 MW0 requests
Withdrawn183,697 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

5 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Gas project 378, Yellowstone County
Gas
175 MWIn study Yellowstone, MTWest May 2020target 2023
Gas project 465, Stillwater County
Gas
150 MWIn study Stillwater, MTWest Jun 2024target 2029
Gas project 464, Broadwater County
Gas
150 MWIn study Broadwater, MTWest Jun 2024target 2029
Gas project 377, Silver Bow County
Gas
36.0 MWPaused / redesign Silver Bow, MTWest May 2020target 2022
Gas project 441, Lewis And Clark County
Gas
12.0 MWIn study Lewis And Clark, MTWest Jan 2023target 2023

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)