United States βΊ Grid βΊ Interconnection queues βΊ Montana
OCTARY USA Β· INTERCONNECTION QUEUESWithdrawn queue requests in Montana (2011 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Onshore wind project 145, Stillwater County Onshore wind |
200 MW | Withdrawn / abandoned |
| Onshore wind project 147, Stillwater County Onshore wind |
200 MW | Withdrawn / abandoned |
| Onshore wind project GI-1102, Blaine County Onshore wind |
90.0 MW | Withdrawn / abandoned |
| Onshore wind project 140, Glacier County Onshore wind |
45.0 MW | Withdrawn / abandoned |
| Onshore wind project 146, Sweet Grass County Onshore wind |
20.0 MW | Withdrawn / abandoned |
| Onshore wind project 136, Deer Lodge County Onshore wind |
20.0 MW | Withdrawn / abandoned |
| Onshore wind project 132, Teton County Onshore wind |
10.0 MW | Withdrawn / abandoned |
| Onshore wind project 137, Stillwater County Onshore wind |
10.0 MW | Withdrawn / abandoned |
| Onshore wind project 142, Wheatland County Onshore wind |
9.9 MW | Withdrawn / abandoned |
| Onshore wind project 143, Wheatland County Onshore wind |
9.9 MW | Withdrawn / abandoned |
| Onshore wind project 141, Wheatland County Onshore wind |
9.9 MW | Withdrawn / abandoned |
| Onshore wind project 144, Wheatland County Onshore wind |
9.9 MW | Withdrawn / abandoned |
| Hydro project 367, Beaverhead County Hydro |
4.7 MW | Withdrawn / abandoned |
| Battery storage project 138, Deer Lodge County Battery storage |
1.0 MW | Withdrawn / abandoned |
| Battery storage project 131, Deer Lodge County Battery storage |
1.0 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)