πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Montana

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in Montana (2011 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown15641 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn15641 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

15 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Onshore wind project 145, Stillwater County
Onshore wind
200 MWWithdrawn / abandoned Stillwater, MTWest Jul 2011target 2013
Onshore wind project 147, Stillwater County
Onshore wind
200 MWWithdrawn / abandoned Stillwater, MTWest Aug 2011target 2013
Onshore wind project GI-1102, Blaine County
Onshore wind
90.0 MWWithdrawn / abandoned Blaine, MTWest Feb 2011target 2013
Onshore wind project 140, Glacier County
Onshore wind
45.0 MWWithdrawn / abandoned Glacier, MTWest May 2011target 2011
Onshore wind project 146, Sweet Grass County
Onshore wind
20.0 MWWithdrawn / abandoned Sweet Grass, MTWest Jul 2011target 2013
Onshore wind project 136, Deer Lodge County
Onshore wind
20.0 MWWithdrawn / abandoned Deer Lodge, MTWest Apr 2011target 2012
Onshore wind project 132, Teton County
Onshore wind
10.0 MWWithdrawn / abandoned Teton, MTWest Mar 2011target 2012
Onshore wind project 137, Stillwater County
Onshore wind
10.0 MWWithdrawn / abandoned Stillwater, MTWest Apr 2011target 2012
Onshore wind project 142, Wheatland County
Onshore wind
9.9 MWWithdrawn / abandoned Wheatland, MTWest Jun 2011target 2012
Onshore wind project 143, Wheatland County
Onshore wind
9.9 MWWithdrawn / abandoned Wheatland, MTWest Jun 2011target 2012
Onshore wind project 141, Wheatland County
Onshore wind
9.9 MWWithdrawn / abandoned Wheatland, MTWest Jun 2011target 2012
Onshore wind project 144, Wheatland County
Onshore wind
9.9 MWWithdrawn / abandoned Wheatland, MTWest Jun 2011target 2012
Hydro project 367, Beaverhead County
Hydro
4.7 MWWithdrawn / abandoned Beaverhead, MTWest Feb 2011
Battery storage project 138, Deer Lodge County
Battery storage
1.0 MWWithdrawn / abandoned Deer Lodge, MTWest Apr 2011target 2011
Battery storage project 131, Deer Lodge County
Battery storage
1.0 MWWithdrawn / abandoned Deer Lodge, MTWest Feb 2011target 2011

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)