πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Montana

ONSHORE WIND Β· WEST

Onshore wind project GI-1102, Blaine County

Onshore wind project GI-1102, Blaine County is a 90.0 MW onshore wind request withdrawn in the West interconnection queue, in Blaine County, Montana, connecting to WAPA/BEPC/HCPD Integrated System.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2011 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GI-1102
Grid region
West (non-ISO utilities)
Utility / transmission owner
WAPA/BEPC/HCPD Integrated System
Connection point (POI)
Ft Peck-Havre 161kV
Location
Blaine County, Montana
Technology
Wind: 90.0 MW
Total requested
90.0 MW
Service type
NRIS and ERIS
Study phase
IAP
Queue status
Withdrawn
Entered queue
14 February 2011
Proposed online date
December 2013

Location

Marker shows the centre of Blaine County; the queue data does not give exact sites.

Power plants in Montana Β· Transmission lines in Montana

Other requests in Blaine County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem