United States βΊ Grid βΊ Interconnection queues βΊ Montana
ONSHORE WIND Β· WESTOnshore wind project GI-1011, Blaine County
Onshore wind project GI-1011, Blaine County is a 70.0 MW onshore wind request withdrawn in the West interconnection queue, in Blaine County, Montana, connecting to WAPA/BEPC/HCPD Integrated System.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2010 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GI-1011
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- WAPA/BEPC/HCPD Integrated System
- Connection point (POI)
- Ft Peck-Havre 161kV
- Location
- Blaine County, Montana
- Technology
- Wind: 70.0 MW
- Total requested
- 70.0 MW
- Service type
- NRIS and ERIS
- Study phase
- IAP
- Queue status
- Withdrawn
- Entered queue
- 18 October 2010
- Proposed online date
- December 2011
Location
Marker shows the centre of Blaine County; the queue data does not give exact sites.
Other requests in Blaine County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem