United States β€Ί Grid β€Ί Interconnection queues β€Ί Montana

OCTARY USA Β· INTERCONNECTION QUEUES

Completed queue projects in Montana (2018 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown6183 MW
Active in queue1,865 MW6 requests
Agreement signed125 MW1 requests
Withdrawn161,147 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

6 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Solar + storage project 341, Beaverhead County
Solar + storage
160 MWOperating Beaverhead, MTWest Jun 20182020
Onshore wind project 343, Wheatland County
Onshore wind
11.3 MWOperating Wheatland, MTWest Jun 20182018
Onshore wind project 349, Meagher County
Onshore wind
3.0 MWOperating Meagher, MTWest Jul 20182018
Onshore wind project 350, Meagher County
Onshore wind
3.0 MWOperating Meagher, MTWest Jul 20182018
Onshore wind project 348, Meagher County
Onshore wind
3.0 MWOperating Meagher, MTWest Jul 20182018
Hydro project 339, Lewis And Clark County
Hydro
2.7 MWOperating Lewis And Clark, MTWest Jan 20182018

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)