United States › Grid › Interconnection queues › Montana
SOLAR + STORAGE · WESTSolar + storage project 341, Beaverhead County
Solar + storage project 341, Beaverhead County is a 160 MW solar + storage request built and operating in the West interconnection queue, in Beaverhead County, Montana, connecting to NorthWestern Energy.
Request details
- Queue ID
- 341
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- NorthWestern Energy
- Connection point (POI)
- 161kV at Dillon Salmon Substation
- Location
- Beaverhead County, Montana
- Technology
- Solar: 160 MW · Battery
- Total requested
- 160 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study System Impact Study System Impact Re-Study Facility Study
- Queue status
- Operational
- Entered queue
- 6 June 2018
- Proposed online date
- December 2020
- Came online
- December 2020
Location
Marker shows the centre of Beaverhead County; the queue data does not give exact sites.
Other requests in Beaverhead County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem