United States βΊ Grid βΊ Interconnection queues βΊ Montana
SOLAR + STORAGE Β· WESTSolar + storage project 368, Beaverhead County
Solar + storage project 368, Beaverhead County is a 200 MW solar + storage request withdrawn in the West interconnection queue, in Beaverhead County, Montana, connecting to NorthWestern Energy.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2019 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 368
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- NorthWestern Energy
- Connection point (POI)
- 230kV at Peterson Flats Substation
- Location
- Beaverhead County, Montana
- Technology
- Solar: 200 MW Β· Battery
- Total requested
- 200 MW
- Service type
- Energy only (ERIS)
- Study phase
- Sysytem Impact Facilities Study
- Queue status
- Withdrawn
- Entered queue
- 9 October 2019
- Proposed online date
- April 2021
Location
Marker shows the centre of Beaverhead County; the queue data does not give exact sites.
Other requests in Beaverhead County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem