Interconnection queue in Michigan (2020 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown162,565 MW
Active in queue2,565 MW16 requests
Agreement signed2,065 MW12 requests
Withdrawn344,217 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

16 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Solar + storage project J1586, Calhoun County
Solar + storage
499 MWAgreement signed Calhoun, MIMISO Jun 2020target 2025
Onshore wind project J1557, Sanilac County
Onshore wind
293 MWAgreement signed Sanilac, MIMISO Jun 2020target 2026
Solar project J1614, Muskegon County
Solar
250 MWAgreement signed Muskegon, MIMISO Jun 2020target 2025
Solar project J1525, Huron County
Solar
200 MWAgreement signed Huron, MIMISO Jun 2020target 2026
Solar project J1664, St. Clair County
Solar
200 MWAgreement signed St. Clair, MIMISO Jun 2020target 2026
Solar project J1550, Branch County
Solar
200 MWAgreement signed Branch, MIMISO Jun 2020target 2025
Cass County Solar
Solar + storage Β· Steelhead Solar, LLC
200 MWIn study Cass, MIPJM Mar 2020target 2023
Gemstone Solar
Solar
150 MWAgreement signed Cass, MIPJM Jan 2020target 2028
Battery storage project J1845, Calhoun County
Battery storage
100 MWIn study Calhoun, MIMISO Dec 2020target 2025
Battery storage project J1659, Washtenaw County
Battery storage
100 MWUnder construction Washtenaw, MIMISO Jun 2020target 2025
Solar project J1587, Muskegon County
Solar
100 MWAgreement signed Muskegon, MIMISO Jun 2020target 2025
Battery storage project J1844, Washtenaw County
Battery storage
100 MWIn study Washtenaw, MIMISO Dec 2020target 2024
Battery storage project J1635, Branch County
Battery storage
100 MWAgreement signed Branch, MIMISO Jun 2020target 2025
Gas project J1798, Wayne County
Gas
25.0 MWAgreement signed Wayne, MIMISO Jun 2020target 2023
Decatur Battery Storage
Battery storage Β· Decatur Storage LLC
25.0 MWAgreement signed Van Buren, MIPJM Aug 2020target 2029
Solar project J1814, Dickinson County
Solar
22.5 MWAgreement signed Dickinson, MIMISO Jun 2020target 2026

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)