Withdrawn queue requests in Massachusetts (2011 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown5586 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn5586 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

5 requests
ProjectCapacityStatusLocationRegionQueuedOnline
CC Administrative Increase
Gas
550 MWWithdrawn / abandoned Hampden, MAISO-NE Aug 2011
Combined Cycle Increase
Gas
20.2 MWWithdrawn / abandoned Berkshire, MAISO-NE Jan 2011target 2011
Solar
Solar
6.0 MWWithdrawn / abandoned Bristol, MAISO-NE Mar 2011target 2012
Solar
Solar
4.9 MWWithdrawn / abandoned Hampden, MAISO-NE Apr 2011target 2012
CornerStone Power Monson 2
Solar
4.9 MWWithdrawn / abandoned Hampden, MAISO-NE Oct 2011target 2014

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)