United States β€Ί Grid β€Ί Interconnection queues β€Ί Massachusetts

OCTARY USA Β· INTERCONNECTION QUEUES

Queue requests in study in Massachusetts

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown185,196 MW
Active in queue11.2 GW35 requests
Agreement signed6,013 MW17 requests
Withdrawn37048.3 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

18 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Offshore Wind
Offshore wind
827 MWIn study MAISO-NE Dec 2018target 2032
Battery Storage
Battery storage
500 MWIn study Middlesex, MAISO-NE Jun 2024target 2028
Battery Storage
Battery storage
500 MWIn study Barnstable, MAISO-NE May 2024target 2028
Offshore Wind Inc. (Q806)
Offshore wind
487 MWIn study MAISO-NE Mar 2021target 2032
Battery Storage
Battery storage
350 MWIn study Bristol, MAISO-NE Oct 2023target 2027
Battery Storage
Battery storage
300 MWIn study Norfolk, MAISO-NE Mar 2022target 2028
Battery Storage
Battery storage
300 MWIn study Worcester, MAISO-NE Apr 2024target 2028
Battery Storage
Battery storage
290 MWIn study Berkshire, MAISO-NE Apr 2024target 2028
Battery Storage
Battery storage
250 MWIn study Hampden, MAISO-NE Mar 2023target 2029
Battery Storage
Battery storage
225 MWIn study Essex, MAISO-NE Jun 2024target 2028
Battery Storage
Battery storage
200 MWIn study Essex, MAISO-NE Jun 2024target 2028
Battery Storage
Battery storage
180 MWIn study Worcester, MAISO-NE May 2024target 2028
Battery Storage
Battery storage
170 MWIn study Berkshire, MAISO-NE May 2024target 2029
Battery Storage
Battery storage
170 MWIn study Hampden, MAISO-NE May 2024target 2029
Battery Storage
Battery storage
168 MWIn study Bristol, MAISO-NE Jun 2023target 2027
Battery Storage
Battery storage
136 MWIn study Berkshire, MAISO-NE Apr 2024target 2028
Battery Storage
Battery storage
125 MWIn study Middlesex, MAISO-NE Jun 2024target 2028
Offshore wind Inc (QP700)
Offshore wind
18.0 MWIn study MAISO-NE Aug 2021target 2026

Capacity in the queue by state

Click a state to drill down.

By grid region

ISO/RTO markets and the non-ISO West and Southeast.

Requests by year joined

Capacity of requests in this view, by the year they entered the queue. Click a year.

20182024

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)