Withdrawn queue requests in Louisiana (2017 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown9822 MW
Active in queue210 MW3 requests
Agreement signed72.5 MW1 requests
Withdrawn9822 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

9 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project J900, Livingston Parish County
Solar
200 MWWithdrawn / abandoned Livingston Parish, LAMISO Jun 2017target 2020
Onshore wind project J860, Jefferson Davis Parish County
Onshore wind
200 MWWithdrawn / abandoned Jefferson Davis Parish, LAMISO Jun 2017target 2020
Solar project J919A, Richland Parish County
Solar
100 MWWithdrawn / abandoned Richland Parish, LAMISO Jun 2017target 2021
Solar project J852, Ouachita Parish County
Solar
100 MWWithdrawn / abandoned Ouachita Parish, LAMISO Jun 2017target 2019
Solar project GEN-2017-070, Caddo Parish County
Solar
52.2 MWWithdrawn / abandoned Caddo Parish, LASPP May 2017target 2019
Solar project J639, West Baton Rouge Parish, La County
Solar
50.0 MWWithdrawn / abandoned West Baton Rouge Parish, La, LAMISO Jun 2017target 2020
Solar project J659, Franklin Parish County
Solar
50.0 MWWithdrawn / abandoned Franklin Parish, LAMISO Jun 2017target 2019
Solar project J640, St. Helena Parish County
Solar
50.0 MWWithdrawn / abandoned St. Helena Parish, LAMISO Jun 2017target 2019
Solar project J862, Orleans Parish County
Solar
20.0 MWWithdrawn / abandoned Orleans Parish, LAMISO Jun 2017target 2019

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)