United States β€Ί Grid β€Ί Interconnection queues β€Ί Louisiana

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in Louisiana (2014 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown73,505 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn73,505 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

7 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Gas project J404, Jefferson Parish County
Gas
1,078 MWWithdrawn / abandoned Jefferson Parish, LAMISO Nov 2014target 2020
Gas project J425, St. Charles Parish County
Gas
999 MWWithdrawn / abandoned St. Charles Parish, LAMISO Nov 2014
Gas project J402, Orleans Parish County
Gas
991 MWWithdrawn / abandoned Orleans Parish, LAMISO Nov 2014target 2019
Gas project J331, Calcasieu Parish County
Gas
338 MWWithdrawn / abandoned Calcasieu Parish, LAMISO May 2014
Other project J417, Calcasieu Parish County
Other
43.0 MWWithdrawn / abandoned Calcasieu Parish, LAMISO Nov 2014
Hydro project J324, Grant Parish County
Hydro
36.2 MWWithdrawn / abandoned Grant Parish, LAMISO Mar 2014target 2017
Onshore wind project J323, St. Mary Parish County
Onshore wind
19.8 MWWithdrawn / abandoned St. Mary Parish, LAMISO Jan 2014

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)