Withdrawn queue requests in Iowa (2020 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown111,051 MW
Active in queue255 MW2 requests
Agreement signed0.0 MW0 requests
Withdrawn111,051 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

11 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project J1547, Franklin County
Solar
250 MWWithdrawn / abandoned Franklin, IAMISO Jun 2020target 2023
Onshore wind project J1822, Franklin County
Onshore wind
200 MWWithdrawn / abandoned Franklin, IAMISO Jun 2020target 2023
Solar project J1533, Adams County
Solar
200 MWWithdrawn / abandoned Adams, IAMISO Jun 2020target 2024
Solar project J1549, Clinton County
Solar
125 MWWithdrawn / abandoned Clinton, IAMISO Jun 2020target 2024
Battery storage project J1733, Allamakee County
Battery storage
50.0 MWWithdrawn / abandoned Allamakee, IAMISO Jun 2020target 2025
Onshore wind project J1729, Hancock County
Onshore wind
43.0 MWWithdrawn / abandoned Hancock, IAMISO Jun 2020target 2023
Onshore wind project J1801, Story County
Onshore wind
39.0 MWWithdrawn / abandoned Story, IAMISO Jun 2020target 2023
Onshore wind project J1728, Story County
Onshore wind
39.0 MWWithdrawn / abandoned Story, IAMISO Jun 2020target 2023
Onshore wind project J1767, Hancock County
Onshore wind
37.0 MWWithdrawn / abandoned Hancock, IAMISO Jun 2020target 2023
Onshore wind project J1776, Osceola County
Onshore wind
34.0 MWWithdrawn / abandoned Osceola, IAMISO Jun 2020target 2023
Onshore wind project J1727, Hancock County
Onshore wind
33.8 MWWithdrawn / abandoned Hancock, IAMISO Jun 2020target 2023

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)