United States βΊ Grid βΊ Interconnection queues βΊ Iowa
ONSHORE WIND Β· MISOOnshore wind project J1822, Franklin County
Onshore wind project J1822, Franklin County is a 200 MW onshore wind request withdrawn in the MISO interconnection queue, in Franklin County, Iowa, connecting to ITC MIDWEST.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2020 (completed)
- Withdrawn / abandonedJan 2021 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J1822
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ITC MIDWEST
- Connection point (POI)
- KILLDEER3 (631199) 345 KV TO BLACKHAWK (636199) 345 kv line Tap
- Location
- Franklin County, Iowa
- Technology
- Wind: 200 MW
- Total requested
- 200 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA In Process; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 25 June 2020
- Proposed online date
- June 2023
- Withdrawn
- January 2021
Location
Marker shows the centre of Franklin County; the queue data does not give exact sites.
Other requests in Franklin County
- Onshore wind project E0015, Franklin CountyOnshore wind Β· 360 MW Β· in study
- Onshore wind project J1867, Franklin CountyOnshore wind Β· 200 MW Β· in study
- Surplus; J416Battery storage Β· 200 MW Β· in study
- Gas project J3154, Franklin CountyGas Β· 160 MW Β· in study
- Solar project J4037, Franklin CountySolar Β· 100 MW Β· in study
- Onshore wind project J1998, Franklin CountyOnshore wind Β· 66.0 MW Β· in study
- Onshore wind project J2122, Franklin CountyOnshore wind Β· 33.0 MW Β· in study
- Onshore wind project J416, Franklin CountyOnshore wind Β· 200 MW Β· built
- Onshore wind project G947, Franklin CountyOnshore wind Β· 99.0 MW Β· built
- Onshore wind project G574, Franklin CountyOnshore wind Β· 80.0 MW Β· built
- Onshore wind project G573, Franklin CountyOnshore wind Β· 80.0 MW Β· built
- Onshore wind project G575, Franklin CountyOnshore wind Β· 40.0 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem