United States β€Ί Grid β€Ί Interconnection queues β€Ί Indiana

OCTARY USA Β· INTERCONNECTION QUEUES

Other interconnection queue in Indiana

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown6263 MW
Active in queue263 MW6 requests
Agreement signed50.0 MW1 requests
Withdrawn246,231 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

6 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Surplus; J1067
Other
60.0 MWIn study White, INMISO May 20222024
Surplus; J1369
Other
50.0 MWAgreement signed Dubois, INMISO May 2022target 2022
Surplus; J1369
Other
50.0 MWIn study Dubois, INMISO Apr 2023target 2024
Surplus; J1386
Other
50.0 MWIn study Lake, INMISO May 2022target 2028
Surplus; J1386
Other
50.0 MWIn study Lake, INMISO Apr 2023target 2024
Surplus; Petersburg
Other
3.0 MWIn study Pike, INMISO May 2022target 2023

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)