United States β€Ί Grid β€Ί Interconnection queues β€Ί Indiana

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in Indiana (2015 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown51,419 MW
Active in queue1,150 MW2 requests
Agreement signed1,150 MW2 requests
Withdrawn51,419 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

5 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Gas project J434, Vermillion County
Gas
1,185 MWWithdrawn / abandoned Vermillion, INMISO Mar 2015target 2019
Onshore wind project AA2-148, Fayette County
Onshore wind
174 MWWithdrawn / abandoned Fayette, INPJM Apr 2015target 2017
Battery storage project AA2-106, Jay County
Battery storage
20.0 MWWithdrawn / abandoned Jay, INPJM Apr 2015target 2018
Solar project J492, Montgomery County
Solar
20.0 MWWithdrawn / abandoned Montgomery, INMISO Nov 2015target 2017
Solar project J491, Bartholomew County
Solar
20.0 MWWithdrawn / abandoned Bartholomew, INMISO Nov 2015target 2017

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)