United States β€Ί Grid β€Ί Interconnection queues β€Ί Indiana

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in Indiana (2012 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown93,410 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn93,410 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

9 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Gas project J259, Shelby County
Gas
1,065 MWWithdrawn / abandoned Shelby, INMISO Nov 2012target 2015
Gas project J250, Shelby County
Gas
999 MWWithdrawn / abandoned Shelby, INMISO Aug 2012
Gas project J240, Vermillion County
Gas
720 MWWithdrawn / abandoned Vermillion, INMISO Apr 2012target 2016
Onshore wind project Y2-107, Lagrange County
Onshore wind
200 MWWithdrawn / abandoned Lagrange, INPJM Nov 2012target 2015
Onshore wind project J257, Newton County
Onshore wind
150 MWWithdrawn / abandoned Newton, INMISO Oct 2012target 2018
Onshore wind project Y2-010, White County
Onshore wind
100 MWWithdrawn / abandoned White, INPJM May 2012target 2015
Onshore wind project J261, Montgomery County
Onshore wind
100 MWWithdrawn / abandoned Montgomery, INMISO Nov 2012
Battery storage project Y2-084, Tippecanoe County
Battery storage
64.0 MWWithdrawn / abandoned Tippecanoe, INPJM Oct 2012target 2014
Battery storage project Y2-112, Wells County
Battery storage
12.0 MWWithdrawn / abandoned Wells, INPJM Nov 2012target 2013

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)