Completed queue projects in Indiana (2014 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown7480 MW
Active in queue715 MW1 requests
Agreement signed715 MW1 requests
Withdrawn293.6 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

7 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Coal project J334, Vigo County
Coal
180 MWOperating Vigo, INMISO May 20142010
Coal project J333, Vigo County
Coal
170 MWOperating Vigo, INMISO May 20142010
Onshore wind project J431, Benton County
Onshore wind
100 MWOperating Benton, INMISO Dec 20142017
Battery storage project J401, Marion County
Battery storage
20.0 MWOperating Marion, INMISO Nov 20142016
Olive Solar Facility
Solar
5.0 MWOperating St. Joseph, INPJM Apr 20142016
Twin Branch Solar Facility
Solar
2.6 MWOperating St. Joseph, INPJM Apr 20142016
Deer Creek Solar Facility
Solar
2.5 MWOperating Grant, INPJM Apr 20142016

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)