United States β€Ί Grid β€Ί Interconnection queues β€Ί Illinois

OCTARY USA Β· INTERCONNECTION QUEUES

Queue requests in study in Illinois (2018 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown5865 MW
Active in queue4,337 MW21 requests
Agreement signed1,662 MW10 requests
Withdrawn5311.2 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

5 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Livingston Wind
Onshore wind Β· Livingston Wind Project, LLC
255 MWIn study Livingston, ILPJM Sep 2018target 2021
Broomstick Solar Energy Centergy Center
Solar
210 MWPaused / redesign Christian, ILPJM Mar 2018target 2028
Lower Crossing Wind
Onshore wind
200 MWPaused / redesign Kankakee, ILPJM Jan 2018target 2026
Leaf River Wind
Onshore wind Β· Leaf River Wind, LLC
150 MWIn study Ogle, ILPJM Sep 2018target 2021
Broomstick Solar Energy Centergy Center
Solar
50.0 MWPaused / redesign Christian, ILPJM Mar 2018target 2028

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)