United States β€Ί Grid β€Ί Interconnection queues β€Ί Illinois

OCTARY USA Β· INTERCONNECTION QUEUES

Completed queue projects in Illinois (2014 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown8879 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn137,366 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

8 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Bright Stalk Generating Facility
Onshore wind
200 MWOperating Livingston, ILPJM Apr 20142019
Invenergy Nelson Expansion LLC
Gas
190 MWOperating Lee, ILPJM Nov 20142023
Invenergy Nelson Expansion LLC
Gas
190 MWOperating Lee, ILPJM Dec 20142023
Otter Creek Wind Farm
Onshore wind
150 MWOperating Livingston, ILPJM Jun 20142020
Gas project J339, Ford County
Gas
96.0 MWOperating Ford, ILMISO May 20142016
University Park North Energy Center
Gas
20.0 MWOperating Will, ILPJM Oct 20142016
Morris Cogen
Gas
20.0 MWOperating Grundy, ILPJM Aug 20142016
Livingston Landfill Gas to Energy Facility
Other
13.3 MWOperating Livingston, ILPJM Apr 20142017

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)