United States β€Ί Grid β€Ί Interconnection queues β€Ί Georgia

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in Georgia (2025 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown133,349 MW
Active in queue9,487 MW53 requests
Agreement signed0.0 MW0 requests
Withdrawn133,349 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

13 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Gas project 25-IC-1328, Stewart County
Gas
759 MWWithdrawn / abandoned Stewart, GASoutheast Apr 2025
Battery storage project 25-IC-1386, Hancock County
Battery storage
450 MWWithdrawn / abandoned Hancock, GASoutheast Apr 2025
Solar project 25-IC-1348, Burke County
Solar
320 MWWithdrawn / abandoned Burke, GASoutheast Apr 2025
Solar project 25-IC-1310, Mitchell County
Solar
261 MWWithdrawn / abandoned Mitchell, GASoutheast Mar 2025
Battery storage project 25-IC-1325, Douglas County
Battery storage
250 MWWithdrawn / abandoned Douglas, GASoutheast Apr 2025
Battery storage project 25-IC-1332, Oglethorpe County
Battery storage
250 MWWithdrawn / abandoned Oglethorpe, GASoutheast Apr 2025
Battery storage project 25-IC-1346, Polk County
Battery storage
225 MWWithdrawn / abandoned Polk, GASoutheast Apr 2025
Solar project 25-IC-1363, Evans County
Solar
195 MWWithdrawn / abandoned Evans, GASoutheast Apr 2025
Solar project 25-IC-1364, Burke County
Solar
175 MWWithdrawn / abandoned Burke, GASoutheast Apr 2025
Solar + storage project 25-IC-1341, Greene County
Solar + storage
150 MWWithdrawn / abandoned Greene, GASoutheast Apr 2025
Solar + storage project 25-IC-1350, Terrell County
Solar + storage
150 MWWithdrawn / abandoned Terrell, GASoutheast Apr 2025
Battery storage project 25-IC-1331, Floyd County
Battery storage
150 MWWithdrawn / abandoned Floyd, GASoutheast Apr 2025
Nuclear project 25-IC-1305, Burke County
Nuclear
14.0 MWWithdrawn / abandoned Burke, GASoutheast Mar 2025

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)