United States β€Ί Grid β€Ί Interconnection queues β€Ί Georgia

BATTERY STORAGE Β· SOUTHEAST

Battery storage project 25-IC-1346, Polk County

Battery storage project 25-IC-1346, Polk County is a 225 MW battery storage request withdrawn in the Southeast interconnection queue, in Polk County, Georgia, connecting to Southern Company.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2025 (completed)
  2. Withdrawn / abandonedJan 2026 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
25-IC-1346
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Southern Company
Connection point (POI)
Portland TS Substation 230 kV Bus
Location
Polk County, Georgia
Technology
Battery: 225 MW
Total requested
225 MW
Service type
Energy only (ERIS)
Study phase
Withdrawn
Queue status
Withdrawn
Entered queue
14 April 2025
Withdrawn
January 2026

Location

Marker shows the centre of Polk County; the queue data does not give exact sites.

Power plants in Georgia Β· Transmission lines in Georgia

Other requests in Polk County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem