Queue projects under construction in Georgia

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown7692 MW
Active in queue46.5 GW204 requests
Agreement signed16.6 GW57 requests
Withdrawn510106.6 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

7 requests
ProjectCapacityStatusLocationRegionQueuedOnline
SR Grady_SR Whigham
Solar
150 MWUnder construction Grady, GASoutheast Aug 2024target 2028
SR Rochelle Solar
Solar
120 MWUnder construction Wilcox, GASoutheast Dec 2021target 2026
SR Norwood Solar
Solar
107 MWUnder construction Warren, GASoutheast May 2023target 2026
SR Rochelle II Solar
Solar
90.0 MWUnder construction Wilcox, GASoutheast Sep 2023target 2026
SR Bacon
Solar
85.0 MWUnder construction Bacon, GASoutheast Aug 20202023
SR Metter
Solar
80.0 MWUnder construction Candler, GASoutheast Oct 20192022
SR Mendes
Solar
60.0 MWUnder construction Tattnall, GASoutheast Jul 2023target 2026

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)