United States › Grid › Interconnection queues › Georgia
SOLAR · SOUTHEASTSR Rochelle Solar
SR Rochelle Solar is a 120 MW solar request under construction in the Southeast interconnection queue, in Wilcox County, Georgia, connecting to Georgia Transmission.
Queue statusUnder construction
- PlanningQueued Dec 2021 (completed)
- Consented (completed)
- Construction (current stage)
- OperatingTarget Dec 2026 (not yet reached)
- Closed (not yet reached)
Request details
- Queue ID
- GI-158
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Georgia Transmission
- Connection point (POI)
- Fitzgerald - Pitts 115 kV TL
- Location
- Wilcox County, Georgia
- Technology
- Solar: 120 MW
- Total requested
- 120 MW
- Study phase
- Full NTP
- Queue status
- Active
- Entered queue
- 9 December 2021
- Proposed online date
- December 2026
Location
Marker shows the centre of Wilcox County; the queue data does not give exact sites.
Other requests in Wilcox County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem