Interconnection queue in Florida (2021 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown91,303 MW
Active in queue1,303 MW9 requests
Agreement signed630 MW2 requests
Withdrawn121,618 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

9 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Bull Creek (Osceola Generating Station)
Gas
555 MWAgreement signed Osceola, FLSoutheast Sep 2021target 2025
Battery storage project 292, Pinellas County
Battery storage Β· Duke Energy Florida, LLC
225 MWUnder construction Pinellas, FLSoutheast Apr 2021target 2025
Solar + storage project JEA-Q009, Duval County
Solar + storage
74.9 MWIn study Duval, FLSoutheast Jul 2021target 2026
Solar + storage project 425, Bradford County
Solar + storage Β· Third Party
74.9 MWAgreement signed Bradford, FLSoutheast Aug 2021target 2028
Solar project 293, Alachua County
Solar Β· Pleasant Solar, LLC
74.9 MWPaused / redesign Alachua, FLSoutheast Aug 2021target 2024
Solar project 424D, Madison County
Solar Β· FPL
74.5 MWIn study Madison, FLSoutheast Aug 2021target 2027
Solar project 424A, Leon County
Solar Β· FPL
74.5 MWIn study Leon, FLSoutheast Aug 2021target 2033
Solar project 424B, Leon County
Solar Β· FPL
74.5 MWIn study Leon, FLSoutheast Aug 2021target 2033
Solar project 424, Manatee County
Solar Β· FPL
74.5 MWIn study Manatee, FLSoutheast May 2021target 2027

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)