United States β€Ί Grid β€Ί Interconnection queues β€Ί Florida

OCTARY USA Β· INTERCONNECTION QUEUES

Completed queue projects in Florida (2022 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown7270 MW
Active in queue4,026 MW54 requests
Agreement signed75.0 MW1 requests
Withdrawn473,356 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

7 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project 321, Sumter County
Solar Β· Duke Energy Florida, LLC
74.9 MWOperating Sumter, FLSoutheast Dec 20222025
Solar project 306, Madison County
Solar Β· Duke Energy Florida, LLC
74.9 MWOperating Madison, FLSoutheast Apr 20222025
Solar project 467, Okaloosa County
Solar Β· FPL
74.5 MWOperating Okaloosa, FLSoutheast May 20222024
Solar project 426, Miami-Dade County
Solar Β· FPL
24.5 MWOperating Miami-Dade, FLSoutheast Feb 20222025
Battery storage project 89, Hillsborough County
Battery storage
15.0 MWOperating Hillsborough, FLSoutheast May 2022target 2023
Battery storage project 318, Suwannee County
Battery storage Β· Duke Energy Florida, LLC
5.0 MWOperating Suwannee, FLSoutheast Dec 20222024
Solar project 88, Hillsborough County
Solar
1.0 MWOperating Hillsborough, FLSoutheast May 2022target 2022

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)