Withdrawn queue requests in Connecticut (2022 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown8634 MW
Active in queue317 MW3 requests
Agreement signed292 MW2 requests
Withdrawn8634 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

8 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Battery Storage
Battery storage
125 MWWithdrawn / abandoned Hartford, CTISO-NE Aug 2022target 2027
Battery Storage
Battery storage
107 MWWithdrawn / abandoned Windham, CTISO-NE Sep 2022target 2026
Battery Storage
Battery storage
100 MWWithdrawn / abandoned Hartford, CTISO-NE May 2022target 2025
Battery Storage
Battery storage
93.2 MWWithdrawn / abandoned New London, CTISO-NE Nov 2022target 2027
Battery Storage
Battery storage
80.9 MWWithdrawn / abandoned Middlesex, CTISO-NE May 2022target 2026
Battery Storage
Battery storage
60.0 MWWithdrawn / abandoned Hartford, CTISO-NE Apr 2022target 2024
Battery Storage
Battery storage
51.7 MWWithdrawn / abandoned New London, CTISO-NE May 2022target 2025
Battery Storage Addition
Battery storage
16.0 MWWithdrawn / abandoned New London, CTISO-NE Apr 2022target 2027

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)