United States β€Ί Grid β€Ί Interconnection queues β€Ί Connecticut

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in Connecticut (2019 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown72,851 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn72,851 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

7 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Offshore Wind
Offshore wind
1,200 MWWithdrawn / abandoned CTISO-NE Jun 2019target 2025
Offshore Wind
Offshore wind
1,200 MWWithdrawn / abandoned CTISO-NE Sep 2019target 2031
Simple Cycle Combustion Turbine Repowering (alternative to Q647)
Gas
378 MWWithdrawn / abandoned Middlesex, CTISO-NE Apr 2019target 2023
Gas turbine repowering (Alt. to Q647)
Gas
23.0 MWWithdrawn / abandoned Middlesex, CTISO-NE Jun 2019target 2025
Fuel Cell
Gas
20.2 MWWithdrawn / abandoned Hartford, CTISO-NE Apr 2019target 2020
Solar
Solar
20.0 MWWithdrawn / abandoned Windham, CTISO-NE Mar 2019target 2020
CT additional
Gas
10.0 MWWithdrawn / abandoned Tolland, CTISO-NE Jun 2019target 2021

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)