United States βΊ Grid βΊ Interconnection queues βΊ Connecticut
SOLAR Β· ISO-NESolar
Solar is a 20.0 MW solar request withdrawn in the ISO-NE interconnection queue, in Windham County, Connecticut.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2019 (completed)
- Withdrawn / abandonedNov 2019 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 845
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- 3 Breaker Ring Bus on the Eversource 1607 Line (modeling based on same point as Exeter Tap for practical purposes)
- Location
- Windham County, Connecticut
- Technology
- Solar: 20.0 MW
- Total requested
- 20.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 18 March 2019
- Proposed online date
- July 2020
- Withdrawn
- November 2019
Location
No county location in the queue data.
Power plants in Connecticut Β· Transmission lines in Connecticut
Other requests in Windham County
- Husky SolarSolar Β· 50.2 MW Β· agreement signed
- Lake Road UpgradesGas Β· 49.8 MW Β· built
- Quinebaug SolarSolar Β· 49.0 MW Β· built
- Plainfield Renewable Energy ProjectOther Β· 37.5 MW Β· built
- Mechanicsville Hydro IncreaseHydro Β· 0.3 MW Β· built
- Combined CycleGas Β· 1,120 MW Β· withdrawn
- NTE ConnecticutGas Β· 672 MW Β· withdrawn
- Combined CycleGas Β· 563 MW Β· withdrawn
- Battery StorageBattery storage Β· 325 MW Β· withdrawn
- Battery StorageBattery storage Β· 300 MW Β· withdrawn
- Combined CycleGas Β· 250 MW Β· withdrawn
- Battery StorageBattery storage Β· 205 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem