OCTARY USA Β· INTERCONNECTION QUEUESInterconnection queue in California (2025 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Other project SC1Q31, Sacramento County Other |
400 MW | In study |
| Solar project 25-00381, Lassen County Solar |
300 MW | In study |
| Other project SC1Q33, Sacramento County Other |
250 MW | In study |
| Battery storage project SC1Q32, Sacramento County Battery storage |
200 MW | In study |
| Battery storage project T2-072, Siskiyou County Battery storage |
150 MW | In study |
| Gas project GI-2025-179, Imperial County Gas |
34.8 MW | In study |
| Solar + storage project T2-078, Modoc County Solar + storage |
24.9 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)