United States βΊ Grid βΊ Interconnection queues βΊ California
OCTARY USA Β· INTERCONNECTION QUEUESGas interconnection queue in California
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Aviation Gas |
1,200 MW | In study |
| Sunrise Power Improvement Gas |
656 MW | In study |
| Duran Gas |
600 MW | In study |
| Comstock Gas |
398 MW | In study |
| Midway Peaking Gas |
240 MW | Agreement signed |
| Tracy Combined-Cycle Power Plant Gas |
185 MW | Agreement signed |
| Los Esteros Critical Energy Facility Expansion Gas |
123 MW | Agreement signed |
| Fresno Cogeneration Expansion Project Gas |
91.8 MW | Agreement signed |
| Gas project GI-2025-179, Imperial County Gas |
34.8 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)