Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown51,065 MW
Active in queue1,065 MW5 requests
Agreement signed80.0 MW1 requests
Withdrawn121,998 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

5 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project J1060, St. Francis County
Solar
500 MWUnder construction St. Francis, ARMISO Mar 2018target 2023
Solar project J1007, Crittenden County
Solar
200 MWUnder construction Crittenden, ARMISO Mar 20182023
Solar project J1155, Mississippi County
Solar
150 MWUnder construction Mississippi, ARMISO Mar 20182024
Solar project J1125, Cross County
Solar
135 MWUnder construction Cross, ARMISO Mar 2018target 2023
Solar project GEN-2018-064, Benton County
Solar
80.0 MWAgreement signed Benton, ARSPP Oct 2018target 2027

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)