United States β€Ί Grid β€Ί Interconnection queues β€Ί Arkansas

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in Arkansas (2020 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown7568 MW
Active in queue1,250 MW8 requests
Agreement signed200 MW1 requests
Withdrawn7568 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

7 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project J1592, Pope County
Solar
200 MWWithdrawn / abandoned Pope, ARMISO Jun 2020target 2023
Solar project J1811, Independence County
Solar
150 MWWithdrawn / abandoned Independence, ARMISO Jun 2020target 2023
Solar project J1722, Lonoke County
Solar
100 MWWithdrawn / abandoned Lonoke, ARMISO Jun 2020target 2024
Onshore wind project J1841, Cross County
Onshore wind
52.0 MWWithdrawn / abandoned Cross, ARMISO Jun 2020target 2023
Battery storage project J1499, Union County
Battery storage
50.0 MWWithdrawn / abandoned Union, ARMISO Jun 2020target 2023
Solar + storage project J1648, Searcy County
Solar + storage
10.0 MWWithdrawn / abandoned Searcy, ARMISO Jun 2020target 2021
Solar project J1789, Monroe County
Solar
6.0 MWWithdrawn / abandoned Monroe, ARMISO Jun 2020target 2021

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)