United States βΊ Grid βΊ Interconnection queues βΊ Arkansas
SOLAR + STORAGE Β· MISOSolar + storage project J1648, Searcy County
Solar + storage project J1648, Searcy County is a 10.0 MW solar + storage request withdrawn in the MISO interconnection queue, in Searcy County, Arkansas, connecting to ENTERGY ARKANSAS.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2020 (completed)
- Withdrawn / abandonedDec 2020 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J1648
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ENTERGY ARKANSAS
- Connection point (POI)
- Searcy Price 161kV
- Location
- Searcy County, Arkansas
- Technology
- Solar: 10.0 MW Β· Battery
- Total requested
- 10.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA In Process; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 25 June 2020
- Proposed online date
- August 2021
- Withdrawn
- December 2020
Location
Marker shows the centre of Searcy County; the queue data does not give exact sites.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem