United States β€Ί Grid β€Ί Interconnection queues β€Ί Arkansas

SOLAR + STORAGE Β· MISO

Solar + storage project J1648, Searcy County

Solar + storage project J1648, Searcy County is a 10.0 MW solar + storage request withdrawn in the MISO interconnection queue, in Searcy County, Arkansas, connecting to ENTERGY ARKANSAS.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2020 (completed)
  2. Withdrawn / abandonedDec 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J1648
Grid region
MISO (Midcontinent)
Utility / transmission owner
ENTERGY ARKANSAS
Connection point (POI)
Searcy Price 161kV
Location
Searcy County, Arkansas
Technology
Solar: 10.0 MW Β· Battery
Total requested
10.0 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: GIA In Process; Post GIA Status: Not Started
Queue status
Withdrawn
Entered queue
25 June 2020
Proposed online date
August 2021
Withdrawn
December 2020

Location

Marker shows the centre of Searcy County; the queue data does not give exact sites.

Power plants in Arkansas Β· Transmission lines in Arkansas

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem