Withdrawn queue requests in Alabama (2017 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown13961 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn13961 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

13 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project 324, Limestone County
Solar
200 MWWithdrawn / abandoned Limestone, ALSoutheast Aug 2017
Solar project 328, Colbert County
Solar
80.0 MWWithdrawn / abandoned Colbert, ALSoutheast Sep 2017
Solar project IC-650, Perry County
Solar
80.0 MWWithdrawn / abandoned Perry, ALSoutheast Aug 2017
Solar project IC-638, Elmore County
Solar
80.0 MWWithdrawn / abandoned Elmore, ALSoutheast May 2017
Solar project IC-610, Lowndes County
Solar
79.5 MWWithdrawn / abandoned Lowndes, ALSoutheast Mar 2017
Solar project IC-609, Barbour County
Solar
79.5 MWWithdrawn / abandoned Barbour, ALSoutheast Mar 2017
Solar project IC-647, Macon County
Solar
78.6 MWWithdrawn / abandoned Macon, ALSoutheast Jul 2017
Solar project IC-596, Marengo County
Solar
78.0 MWWithdrawn / abandoned Marengo, ALSoutheast Feb 2017
Solar project IC-595, Marengo County
Solar
78.0 MWWithdrawn / abandoned Marengo, ALSoutheast Feb 2017
Solar project 330, Limestone County
Solar
69.0 MWWithdrawn / abandoned Limestone, ALSoutheast Oct 2017
Solar project IC-639, Henry County
Solar
20.0 MWWithdrawn / abandoned Henry, ALSoutheast May 2017
Solar project IC-611, Montgomery County
Solar
19.3 MWWithdrawn / abandoned Montgomery, ALSoutheast Mar 2017
Solar project IC-612, Montgomery County
Solar
19.3 MWWithdrawn / abandoned Montgomery, ALSoutheast Mar 2017

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)