πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Minnesota

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in Minnesota, West

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown4405 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn4405 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

4 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Onshore wind project GI-0719, Wilkin County
Onshore wind
201 MWWithdrawn / abandoned Wilkin, MNWest Oct 2007target 2011
Onshore wind project GI-1008, Lincoln County
Onshore wind
150 MWWithdrawn / abandoned Lincoln, MNWest Sep 2010target 2012
Gas project GI-0109, Clay County
Gas
50.0 MWWithdrawn / abandoned Clay, MNWest Aug 2001
Onshore wind project GI-0914, Lyon County
Onshore wind
3.6 MWWithdrawn / abandoned Lyon, MNWest May 2009target 2010

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)