Onshore wind project GI-1008, Lincoln County

Onshore wind project GI-1008, Lincoln County is a 150 MW onshore wind request withdrawn in the West interconnection queue, in Lincoln County, Minnesota, connecting to WAPA/BEPC/HCPD Integrated System.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2010 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GI-1008
Grid region
West (non-ISO utilities)
Utility / transmission owner
WAPA/BEPC/HCPD Integrated System
Connection point (POI)
Ivanhoe 115kV
Location
Lincoln County, Minnesota
Technology
Wind: 150 MW
Total requested
150 MW
Service type
Energy only (ERIS)
Study phase
IAP
Queue status
Withdrawn
Entered queue
27 September 2010
Proposed online date
December 2012

Location

Marker shows the centre of Lincoln County; the queue data does not give exact sites.