OCTARY USA Β· INTERCONNECTION QUEUESQueue requests in study in SPP (Southwest Power Pool) (2019 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Battery storage project GEN-2019-065, Smith County Battery storage |
180 MW | In study |
| Solar project GEN-2019-054, Barton County Solar |
150 MW | Paused / redesign |
| Solar project GEN-2019-009, Nemaha County Solar |
100 MW | Paused / redesign |
| Solar project GEN-2019-041, Lancaster County Solar |
78.0 MW | Paused / redesign |
| Battery storage project GEN-2019-068, Barton County Battery storage |
50.0 MW | Paused / redesign |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)46 Β· 17.8 GW
- PJM (Mid-Atlantic, Midwest)60 Β· 7,820 MW
- ERCOT (Texas)38 Β· 5,908 MW
- NYISO (New York)31 Β· 2,705 MW
- CAISO (California)3 Β· 2,352 MW
- Southeast (non-ISO utilities)12 Β· 1,469 MW
- MISO (Midcontinent)7 Β· 1,168 MW
- SPP (Southwest Power Pool)5 Β· 558 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)