Projects with signed interconnection agreements in SPP (Southwest Power Pool) (2022 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown4790 MW
Active in queue4,717 MW25 requests
Agreement signed790 MW4 requests
Withdrawn9119.4 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

4 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Gas project GEN-2022-GR1, Harrison County
Gas
513 MWAgreement signed Harrison, TXSPP Mar 2022target 2027
Battery storage project GEN-2023-SR4, Burke County
Battery storage
170 MWAgreement signed Burke, NDSPP Dec 2022target 2026
Battery storage project GEN-2023-SR5, Dewey County
Battery storage
85.0 MWAgreement signed Dewey, OKSPP Dec 2022target 2026
Other project GEN-2023-SR1, Brown County
Other
21.9 MWAgreement signed Brown, NESPP Dec 20222024

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)