Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown5633 MW
Active in queue2,085 MW15 requests
Agreement signed633 MW5 requests
Withdrawn397,303 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

5 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project GEN-2021-033, Franklin County
Solar
204 MWAgreement signed Franklin, ARSPP May 2021target 2028
Solar project GEN-2021-036, Little River County
Solar
204 MWAgreement signed Little River, ARSPP May 2021target 2027
Solar project GEN-2018-064, Benton County
Solar
80.0 MWAgreement signed Benton, ARSPP Oct 2018target 2027
Solar project GEN-2017-231, Franklin County
Solar
72.5 MWAgreement signed Franklin, ARSPP Nov 2017target 2027
Battery storage project GEN-2024-SR2, Franklin County
Battery storage
72.5 MWAgreement signed Franklin, ARSPP Feb 2024target 2027

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)