OCTARY USA Β· INTERCONNECTION QUEUESInterconnection queue in PJM (Mid-Atlantic, Midwest) (2015 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Trumbull Energy Center Gas |
940 MW | Agreement signed |
| Sullivan Generating Station 1 Gas |
575 MW | Agreement signed |
| Sullivan Generating Station 2 Gas |
575 MW | Agreement signed |
| Glen Falls Facility Gas |
550 MW | Agreement signed |
| Maryland Offshore Wind Energy Project (MOWEP) Offshore wind |
248 MW | Paused / redesign |
| Mountaineer #1 Coal |
36.0 MW | Agreement signed |
| Cedar Lane Solar Solar |
4.0 MW | Agreement signed |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- CAISO (California)15 Β· 3,789 MW
- West (non-ISO utilities)21 Β· 3,582 MW
- ERCOT (Texas)13 Β· 3,101 MW
- PJM (Mid-Atlantic, Midwest)7 Β· 2,928 MW
- NYISO (New York)4 Β· 910 MW
- MISO (Midcontinent)8 Β· 688 MW
- Southeast (non-ISO utilities)3 Β· 619 MW
- SPP (Southwest Power Pool)1 Β· 220 MW
- ISO-NE (New England)1 Β· 1.4 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)