United States β€Ί Grid β€Ί Interconnection queues β€Ί West Virginia

COAL Β· PJM

Mountaineer #1

Mountaineer #1 is a 36.0 MW coal request with a signed interconnection agreement in the PJM interconnection queue, connecting to AEP.

Queue statusConsented
  1. PlanningQueued Oct 2015 (completed)
  2. Consented (current stage)
  3. Construction (not yet reached)
  4. OperatingDec 2018 (not yet reached)
  5. Closed (not yet reached)

Request details

Queue ID
AB1-109
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
AEP
Connection point (POI)
Mountaineer
Location
West Virginia
Technology
Coal: 36.0 MW
Total requested
36.0 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
Queue status
Active
Entered queue
26 October 2015
Proposed online date
June 2021
Came online
December 2018

Location

No county location in the queue data.

Power plants in West Virginia Β· Transmission lines in West Virginia

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem