United States β€Ί Grid β€Ί Interconnection queues β€Ί North Carolina

OCTARY USA Β· INTERCONNECTION QUEUES

Interconnection queue in North Carolina, PJM (2016 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown4415 MW
Active in queue415 MW4 requests
Agreement signed340 MW3 requests
Withdrawn15342 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

4 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Cherry Solar
Solar
180 MWAgreement signed Northampton, NCPJM Oct 2016target 2025
Halifax County Solar
Solar
80.0 MWAgreement signed Halifax, NCPJM Nov 2016target 2026
Pitt Solar
Solar
80.0 MWAgreement signed Pitt, NCPJM Oct 2016target 2026
Edgecome Solar Energy Center
Solar
75.0 MWPaused / redesign Edgecombe, NCPJM Aug 2016target 2025

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)