πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Michigan

OCTARY USA Β· INTERCONNECTION QUEUES

Queue requests in study in Michigan, PJM

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown131,586 MW
Active in queue1,996 MW18 requests
Agreement signed410 MW5 requests
Withdrawn182,816 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

13 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Three Lakes Solar
Solar + storage Β· Three Lakes Solar LLC
300 MWIn study St. Joseph, MIPJM Sep 2019target 2022
Cass County Solar
Solar + storage Β· Steelhead Solar, LLC
200 MWIn study Cass, MIPJM Mar 2020target 2023
Solar project AH1-272, Van Buren County
Solar Β· Bankson Solar Project, LLC
185 MWIn study Van Buren, MIPJM Feb 2025target 2025
Solar + storage project AH2-373, Berrien County
Solar + storage
180 MWIn study Berrien, MIPJM Mar 2022target 2028
Wingstem Solar Energy Farm
Solar
150 MWPaused / redesign Cass, MIPJM Sep 2018target 2025
Battery storage project AI1-166, Cass County
Battery storage
150 MWIn study Cass, MIPJM Sep 2022target 2028
Solar + storage project AH2-149, Van Buren County
Solar + storage
150 MWIn study Van Buren, MIPJM Feb 2022target 2026
Solar + storage project AH2-418, Berrien County
Solar + storage
100 MWIn study Berrien, MIPJM Mar 2022target 2026
Solar project AI2-358, Van Buren County
Solar
70.0 MWIn study Van Buren, MIPJM Mar 2023target 2028
Solar project AI2-144, St. Joseph County
Solar
36.0 MWIn study St. Joseph, MIPJM Feb 2023target 2025
Solar project AI2-169, Cass County
Solar
24.0 MWIn study Cass, MIPJM Mar 2023target 2025
Solar project AI2-340, Van Buren County
Solar
23.1 MWIn study Van Buren, MIPJM Mar 2023target 2025
Solar project AI2-215, Cass County
Solar
18.1 MWIn study Cass, MIPJM Mar 2023target 2026

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)