United States β€Ί Grid β€Ί Interconnection queues β€Ί Michigan

OCTARY USA Β· INTERCONNECTION QUEUES

Completed queue projects in Michigan, PJM

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown112,379 MW
Active in queue1,996 MW18 requests
Agreement signed410 MW5 requests
Withdrawn182,816 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

11 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Gas project T94, Van Buren County
Gas
1,035 MWOperating Van Buren, MIPJM Oct 20072016
Indeck Niles Energy Center
Gas
994 MWOperating Cass, MIPJM Apr 20152021
D.C. Cook Generating Plant Unit No. 2
Nuclear
102 MWOperating Berrien, MIPJM Aug 20132017
Indeck Niles Energy Center
Gas
91.0 MWOperating Cass, MIPJM Oct 20162021
Cook #1
Nuclear
84.0 MWOperating Berrien, MIPJM Jul 20052006
DC Cook Generating Plant Unit No. 2
Nuclear
38.0 MWOperating Berrien, MIPJM Mar 20172017
Covert Generating Facility
Gas
20.0 MWOperating Van Buren, MIPJM Sep 20162018
Southeast Berrien LF
Other
6.4 MWOperating Berrien, MIPJM Dec 20072009
Watervliet Solar Facility
Solar
4.6 MWOperating Berrien, MIPJM Apr 20142016
Orchard Hills
Other
3.2 MWOperating Berrien, MIPJM Mar 20112013
Orchard Hills Sanitary Landfill
Other
0.8 MWOperating Berrien, MIPJM Jun 20182019

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)