Southeast Berrien LF

Southeast Berrien LF is a 6.4 MW other request built and operating in the PJM interconnection queue, in Berrien County, Michigan, connecting to AEP.

Queue statusOperating
  1. PlanningQueued Dec 2007 (completed)
  2. ConsentedJul 2008 (completed)
  3. Construction (completed)
  4. OperatingMay 2009 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
T111
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
AEP
Connection point (POI)
Buchanan Hydro-Niles 69kV
Location
Berrien County, Michigan
Technology
Other: 6.4 MW
Total requested
6.4 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
Queue status
Operational
Entered queue
12 December 2007
Agreement signed
31 July 2008
Proposed online date
May 2009
Came online
May 2009

Location

Marker shows the centre of Berrien County; the queue data does not give exact sites.

Power plants in Michigan · Transmission lines in Michigan

Other requests in Berrien County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem