ONSHORE WIND Β· MISOOnshore wind project J632, Berrien County
Onshore wind project J632, Berrien County is a 200 MW onshore wind request withdrawn in the MISO interconnection queue, in Berrien County, Michigan, connecting to METC.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2017 (completed)
- Withdrawn / abandonedJan 2019 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J632
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- METC
- Connection point (POI)
- Argenta - Plaisades 345kV Line
- Location
- Berrien County, Michigan
- Technology
- Wind: 200 MW
- Total requested
- 200 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 16 June 2017
- Proposed online date
- September 2018
- Withdrawn
- January 2019
Location
Marker shows the centre of Berrien County; the queue data does not give exact sites.
Other requests in Berrien County
- Solar + storage project AH2-373, Berrien CountySolar + storage Β· 180 MW Β· in study
- Solar + storage project AH2-418, Berrien CountySolar + storage Β· 100 MW Β· in study
- D.C. Cook Generating Plant Unit No. 2Nuclear Β· 102 MW Β· built
- Cook #1Nuclear Β· 84.0 MW Β· built
- DC Cook Generating Plant Unit No. 2Nuclear Β· 38.0 MW Β· built
- Southeast Berrien LFOther Β· 6.4 MW Β· built
- Watervliet Solar FacilitySolar Β· 4.6 MW Β· built
- Orchard HillsOther Β· 3.2 MW Β· built
- Orchard Hills Sanitary LandfillOther Β· 0.8 MW Β· built
- Gas project N46, Berrien CountyGas Β· 1,120 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem