United States βΊ Grid βΊ Interconnection queues
OCTARY USA Β· INTERCONNECTION QUEUESWithdrawn queue requests in NYISO (New York) (2011 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Poseidon Offshore Offshore wind Β· Anbaric Development Partners, LLC |
500 MW | Withdrawn / abandoned |
| Luyster Creek Energy Gas Β· US PowerGen Co. |
444 MW | Withdrawn / abandoned |
| Clover Leaf Hollers Ave Gas Β· Clover Leaf Power, LLC |
193 MW | Withdrawn / abandoned |
| Watkins Glen East Onshore wind Β· NextEra Energy Resources, LLC |
151 MW | Withdrawn / abandoned |
| Dry Lots Wind Onshore wind Β· Dry Lots Wind, LLC |
33.0 MW | Withdrawn / abandoned |
| Monticello Hills Wind Onshore wind Β· Monticello Hills Wind, LLC |
19.8 MW | Withdrawn / abandoned |
| Bruce Hill Wind Onshore wind Β· Bruce Hill Wind, LLC |
18.0 MW | Withdrawn / abandoned |
| Smokey Avenue Wind Onshore wind Β· Smokey Avenue Wind, LLC |
18.0 MW | Withdrawn / abandoned |
| South Mountain Wind Onshore wind Β· South Mountain Wind, LLC |
18.0 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- CAISO (California)187 Β· 30.0 GW
- PJM (Mid-Atlantic, Midwest)289 Β· 22.9 GW
- Southeast (non-ISO utilities)32 Β· 14.0 GW
- West (non-ISO utilities)157 Β· 12.8 GW
- MISO (Midcontinent)51 Β· 10.5 GW
- SPP (Southwest Power Pool)43 Β· 8,099 MW
- ERCOT (Texas)26 Β· 4,638 MW
- ISO-NE (New England)14 Β· 1,774 MW
- NYISO (New York)9 Β· 1,394 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)