United States β€Ί Grid β€Ί Interconnection queues

OCTARY USA Β· INTERCONNECTION QUEUES

Interconnection queue in ISO-NE (New England) (2019 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown71,764 MW
Active in queue1,764 MW7 requests
Agreement signed1,764 MW7 requests
Withdrawn696,220 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

7 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Bay State Wind 4 Offshore Wind
Offshore wind
1,200 MWAgreement signed MAISO-NE Dec 2019target 2033
Medway Grid Battery Storage
Battery storage
250 MWAgreement signed Norfolk, MAISO-NE Mar 2019target 2025
Energy Storage
Battery storage
170 MWAgreement signed Norfolk, MAISO-NE Apr 2019target 2027
Three Rivers Solar
Solar
100 MWAgreement signed Hancock, MEISO-NE Jan 2019target 2026
GDC Saco Solar
Solar
20.0 MWAgreement signed York, MEISO-NE Oct 2019target 2027
West Baldwin Solar
Solar
17.1 MWAgreement signed Cumberland, MEISO-NE Oct 2019target 2029
Solar
Solar
7.0 MWAgreement signed Kennebec, MEISO-NE Aug 2019target 2022

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)